PROJECT DETAILS
CAMEL provide DFM and Moldflow within 3 working days.
Project Management
1, RFQ & Quote
CAMEL provide quote within 1-2 working days. And provide DFM and mold flow if needed.
2, DFM & Moldflow
3, Mold Design & Design Review
Usually 3D mold drawing for 1 set mold submit within 2-3 working days. and 3-5 sets mold drawing provide within 1 week . CAMEL do care about lead time.
Design review to ensure all requirements completed and correctly before send out mold drawing .
4, Tooling Schedule & Week report
CAMEL provide the first schedule within 24 hours after get customer approve for order& cut steel, and update scheudle with processing pictures on each Monday.
And send project tracker with all sets molds status(Still processing) on each Thursday.
5, Trial Report & FAI Report
Mold trial report will be provided within 24 hours after mold trial, there has picture showing the mold running status and sample's status in trial report, And provide trial video and parameter together.
FAI report of casting sumbit within 72 hours after finish mold trial.
6, Sample approval and Mold Shipment
1) Provide X-ray inspecting report to ensure casting quality.
2) Ship casting within 24 hours after finish trial, and provide waybill in timely.
3) After samples approval and shippment informed. According to Mold checking list to ensure all requiremets completly and correctly to ship to our clients.
7, After-Service
CAMEL have 3 cooperated after-service location at Europe (Austria ,Slovenia), and 5 cooperated after-service location at Unit States (MI,IN,TX).
CAMEL be responsible for the mold production smoothy during mold life.